GENERAL CHARACTERISTICS
- 03 automatic working stations with single blocking die
- customized fixture for machine with interchangeable fixture GS-013-TL.
STATION 01
- presence check and blocking of pipe 1
- presence check of the metal ring on the connector
- insertion of 01 metal ring on the first end of pipe 1
- NON-presence check of the metal ring on the connector after the insertion
- drilling by helical tool for the bush ( this device produces chips and burrs)
- cleaning with ionized air and suction, during and after the drilling cycle
- lifting of the article to facilitate the next loading
- good article signalled by a green light; faulty article signalled by a red light.
STATION 02
- presence check and blocking of pipe 1
- presence check of the metal ring on the connector
- presence check of the bush on the welding clamp
- insertion of 01 metal ring on the second end of pipe 1
- NON presence check of the metal ring on the connector after the insertion
- presence check of the hole and Hot-plate Welding of the bush
- lifting of the article to facilitate the next loading
- good article signalled by a green light; faulty article signalled by a red light
STATION 03
- presence check and blocking of pipe 1
- presence check of the bush on the connector
- presence check of pipe 2 on the welding clamp
- hot-plate welding of pipe 2 on pipe 1
- insertion of the bush on pipe 2 during the joining phase of the welding cycle
- NON presence check of the bush on the connector after the insertion
- lifting of the article to facilitate the next loading
- good article signalled by a green light; faulty article signalled by a red light.
MANUAL OPERATIONS
- loading of a new article on Station 01
- loading of 01 metal ring (components ‘4’) on the inserting units of Station 01
- transfer of the article from Station 01 to Station 02
- loading of 01 metal ring (components ‘4’) on the inserting units of Station 01
- loading of 01 outlet (component ‘3’) on the welding clamp of Station 02
- transfer of the article from Station 02 to Station 03
- loading of Pipe 2 on the welding clamp of Station 03
- insertion of 01 metal ring (component ‘5’) on the inserting unit of Station 03
- unloading of the finished article from Station 03
- pushing of the START button.
-
-