FIXTURE FOR DRILLING, HOT PLATE WELDING, CLEANING, LEAK TESTING AND MARKING BY ENGRAVING OF A PIPE FOR MACHINE GS-013-TL
Fixture for tooling, hot plate welding, testing and marking of a pipe for machine with interchangeable fixture GS-013-TL.
-
FIXTURE FOR TOOLING, HOT PLATE WELDING, TESTING AND MARKING OF A PIPE
GENERAL CHARACTERISTICS
- 03 automatic working stations with single blocking die
- customized fixture for machine with interchangeable fixture GS-013-TL
OPERATIONS OF AUTOMATIC STATION 01
- presence check and blocking of the pipe
- drilling with fingernail-shaped tool for the extraction of the chip to create the seat of 01 45° union and checking of the extraction
- drilling with fingernail-shaped tool for the extraction of the chip to create the seat of 01 small union and checking of the extraction
- good article signalled by a green light; faulty article signalled by a red light
OPERATIONS OF AUTOMATIC STATION 02
- presence check and blocking of the pipe
- hot plate welding of 01 45° union on the pipe
- hot plate welding of 01 small union on the pipe
- internal cleaning of the pipe by means of blow of ionized air and suction of the chips
- good article signalled by a green light; faulty article signalled by a red light
OPERATIONS OF AUTOMATIC STATION 03
- presence check and blocking of the pipe
- leak test with positive pressure on the pipe
- marking by engraving of a dot on the good articles
- good article signalled by a green light; faulty article signalled by a red light
MANUAL OPERATIONS
- unloading of the machined pipe from station 03
- transferring of the semi-finished pipe from station 02 to station 03
- transferring of the semi-finished pipe from station 01 to station 02
- loading of a pipe to machine on station 01
- loading of 02 unions to weld on the respective welding units of station 02
- starting of the automatic cycle
-