FIXTURE FOR DRILLING AND HOT-PLATE WELDING AT THE SAME TIME A FLANGE ON AN ELBOW-CONNECTOR, THE ELBOW-CONNECTOR ON A PIPE, A SECOND FLANGE ON A PIPE FOR MACHINE GS-013-TL
Fixture with 02 automatic stations for checking the presence of components, drilling with fingernail-shaped tool and simultaneous hot-plate welding. Customized fixture inserted in a standard machine with interchangeable fixture GS-013-TL.
-
FIXTURE FOR SIMULTANEOUS DRILLING AND HOT-PLATE WELDING OF PIPES
GENERAL CHARACTERISTICS
- 02 automatic working stations with single blocking die
- customized fixture inserted in a standard machine with interchangeable fixture GS-013-TL
OPERATIONS OF AUTOMATIC STATION 01
- presence check and blocking of the elbow-connector
- presence check of the metal insert of the elbow-connector
- presence check of the spring of the flange
- hot-plate welding with mechanical stoppers of the flange
- good article signalled by a green light; faulty article signalled by a red light
- lifting of the good article to facilitate the next loading
OPERATIONS OF AUTOMATIC STATION 02
- presence check and blocking of the blown article
- presence check of the spring of the semi-finished article from station 01
- presence check of the spring of the flange
- presence check of 02 metal bushings of the rubber seal of the bracket
- hot-plate welding with mechanical stoppers of the semi-finished article from station 01
- hot-plate welding with automatic stoppers of the flange
- hot-plate welding with automatic stoppers of the bracket
- drilling with fingernail-shaped tool for the extraction of the chip to create the connector’s seat and checking of the extraction by means of electrical sensor
- hot-plate welding with mechanical stoppers of the connector
- good article signalled by a green light; faulty article signalled by a red light
MANUAL OPERATIONS
- unloading of the finished article from station 02
- transferring the semi-finished article from station 01 to the welding pliers of station 02
- loading of the articles on station 01 and station 02
- loading of 01 component to weld on station 01
- loading of 02/03 components to weld on station 02 according to the version of the pipe to produce
- starting the automatic cycle
-