FIXTURE FOR CUTTING OF ENDS, DRILLING, HOT PLATE WELDING, LEAK TESTING, INTERNAL CLEANING AND MARKING OF A PIPE FOR MACHINE GS-014-TL

Fixture for tooling, hot plate welding, testing and marking of a pipe for machine with interchangeable fixture GS-014-TL.

  • FIXTURE FOR TOOLING, HOT PLATE WELDING, TESTING AND MARKING OF A PIPE

     

    GENERAL CHARACTERISTICS
    • 04 automatic working stations with single blocking die
    • customized fixture for machine with interchangeable fixture GS-014-TL

     

    OPERATIONS OF AUTOMATIC STATION 01
    • presence check and blocking of the pipe
    • cutting of the bigger end
    • drilling to create the seats of 02 coupled blow-byes
    • punching to create a reference notch at the bigger end
    • good article signalled by a green light; faulty article signalled by a red light

     

    OPERATIONS OF AUTOMATIC STATION 02
    • presence check and blocking of the pipe
    • cutting of the smaller end
    • drilling to create the seats of 02 blow-byes
    • good article signalled by a green light; faulty article signalled by a red light

     

    OPERATIONS OF AUTOMATIC STATION 03
    • presence check and blocking of the pipe
    • hot plate welding of 04 blow-byes on the pipe by means of 03 welding units, the double one of which for the coupled blow-byes
    • punching to create a reference notch at the smaller end
    • internal cleaning of the pipe by means of blow of ionized air and suction of the chips
    • good article signalled by a green light; faulty article signalled by a red light

     

    OPERATIONS OF AUTOMATIC STATION 04
    • presence check and blocking of the pipe
    • leak test with positive pressure on the pipe
    • ink pad marking of the good articles
    • additional marking of the good articles by engraving of a dot
    • good article signalled by a green light; faulty article signalled by a red light

     

    MANUAL OPERATIONS
    • unloading of the machined pipe from station 04
    • transferring of the semi-finished pipe from station 03 to station 04
    • transferring of the semi-finished pipe from station 02 to station 03
    • transferring of the semi-finished pipe from station 01 to station 02
    • loading of a pipe to machine on station 01
    • starting of the automatic cycle
Icons made by freepik from www.flaticon.com