GENERAL CHARACTERISTICS
- 03 automatic working stations with single blocking die
- customized fixture for machine with interchangeable fixture GS-014-TL with two safety windows
OPERATIONS OF AUTOMATIC STATION 01
- presence check and blocking of the pipe
- checking of the internal diameter of the female end by means of fitting/not-fitting plug test
- boring for the creation of 01 metal ring’s seat
- 02 drilling processes with fingernail-shaped tool for the extraction of the chip and checking of the extraction
- punching of the pawl on the female end
- deburring by means of thermos-shrinking of the burrs in the boring area
- pressure insertion of 01 metal ring
- good article signalled by a green light; faulty article signalled by a red light
OPERATIONS OF AUTOMATIC STATION 02
- presence check and blocking of the pipe
- hot plate welding with automatic adjustment of the welding parameters of 02 components on the pipe
- cleaning of the pipe by means of blow of ionized air and suction of the chips
- good article signalled by a green light; faulty article signalled by a red light
OPERATIONS OF AUTOMATIC STATION 03
- presence check and blocking of the pipe
- leak test with positive pressure on the pipe
- ink pad marking of the batch number
- good article signalled by a green light; faulty article signalled by a red light
MANUAL OPERATIONS
- unloading of the machined pipe from station 03
- transferring of the semi-finished pipe from station 02 to station 03
- transferring of the semi-finished pipe from station 01 to station 02
- loading of a pipe to machine on station 01
- loading of 01 metal ring on station 01
- loading of 02 components to weld on station 02
- starting of the automatic cycle