FIXTURE FOR 6 HOT-PLATE WELDING PROCESSES, 3 OF WHICH REGARDING THREE PIPES FOR MACHINE GS-013-TL
Fixture with two stations for hot plate welding of four components on a pipe made up of two blow-molded pipes welded to an injection-molded pipe. Fixture installed in a machine with interchangeable fixture GS-013-TL.
-
FIXTURE FOR 6 HOT-WELDING PROCESSES, 3 OF WHICH REGARDING THREE PIPES
GENERAL CHARACTERISTICS
- 02 automatic working stations with single blocking die
- customized fixture for machine with interchangeable fixture GS-013-TL
OPERATIONS OF AUTOMATIC STATION 01
- presence check and blocking of pipe 01
- presence check of 01 ring at one end of pipe 01
- presence check of 01 ring at one end of pipe 02
- presence check of 01 ring at one end of pipe 03
- hot-plate welding with mechanical stoppers of pipe 02 on pipe 01
- hot-plate welding with mechanical stoppers of pipe 03 on pipe 01
- good article signalled by a green light; faulty article signalled by a red light
- lifting of the article to facilitate the next loading
OPERATIONS OF AUTOMATIC STATION 02
- presence check and blocking of the welded pipe
- presence check of the holes in the welding seats of spigot 01 and spigot 02
- hot-plate welding with mechanical stoppers of spigot 01 and spigot 02 on the pipe
- hot-plate welding with mechanical stoppers of fixation pin 01 on the pipe
- hot-plate welding with mechanical stoppers of fixation pin 02 on the pipe
- good article signalled by a green light; faulty article signalled by a red light
- lifting of the article to facilitate the next loading
MANUAL OPERATIONS
- loading of pipe 01, pipe 02, pipe 03 on station 01
- transferring of the welded pipe from station 01 to station 02
- loading of 02 spigots and 02 fixation pins on station 02
- unloading of the finished pipe from station 02
- starting of the automatic cycle
-
-